Progress

Friday, June 15, 2007

Goals

Ok, first the good news. Since I made the list of goals I have worked quite a bit on my SMokey Mountain Christmas cross stitch work. I haven't touched it since March, so that is something. I worked on it almost all day Wednesday while I was sick in bed. The bears are almost done.

Also, I folded 10 paper cranes. 1 a day would get the goal acomplished, but Iwould rather have some breathing room.

And the bad news...
I went back over the list of 101 things and found quite a few that cannot be "quantified and measured" as specified by the terms I found on Belinda's blog. So, I deleted most of them and need to find new ones. (I had a hard enough time thinking up the first 101.)

This does not mean that I should eat fried foods whenever.

Here is my preliminarily altered list (the bad items have been removed but no new ones added yet.)

1 Lose 100 lbs 10 20 30 40 50 60 70 80 90 100
2 Lose another 100 lbs 10 20 30 40 50 60 70 80 90 100
3
4
5 Learn CPR
6 Take the girls to the dentist 1 2 3 4 5
7 Take the girls to the doctor 1 2 3 4 5
8 Get eyes checked 1 2
9 Grow herb garden, keep alive, use
10 Finish herbalism course
11 Walk to Rivendell
12 Walk from Rivendell to Lorien
13 Walk to Brie
14
15
16 Clean all the aquariums (this is a big job)
17 Keep aquariums clean and topped off
18 Buy 2 show bettas and breed
19 Design and keep green tank
20 Design paludarium
21 Declutter fish supplies
22 finish baby quilt for Sonya (3rd)
23 finish baby quilt for Jen (1st)
24 finish baby quilt for Amanda (2nd)
25 finish Smokey Mountain Christmas
26 finish English Garden Welcome
27 Finish Castle Sampler Tapestry
28 attempt Koolaid dying of wool yarn, knit something cool with it
29 Sew Chinese Jacket, in satin
30 Sew Indian jacket, in silk
31 Sew tunic, in green linen (embroidery too)
32 Sew Jacket in Black w/red lining
33 Sew Jacket in beige tapestry
34 Sew quilt for Ma
35 Sew quilt for Shonda
36 Finish quilt for Naya
37 Finish quilt for Sadira
38 Finish quilt for Laura
39 Finish quilt for my own bed
40 Design greek cross stitch design
41 Sew Greek Cross stitch design
42 Knit a pair of socks
43 Declutter sewing area
44 Stitch Sweetheart Tree Simply Romantic sampler
45 Design quilt from Cross stitch chart
46 Stitch The Holly and The Ivy (for 2008)
47 Art quilt
48 Sew family Christmas stockings
49 complete floss stash (DMC)
50 learn to batik
51 SG:1 Super Marathon, every episode, all 10 seasons
52 SG: Atlantis Marathon, all 3 seasons
53 Fold 1000 paper cranes
54 Learn to turn clay
55 Finish painting of Mom's wedding
56 Fold 100 Christmas ornaments
57 Write out one of my stories
58
59 Learn 1 of the languages on my language disk
60 Learn another language from the disk
61
62 Find some way to tastefully and beautifully display chopstick collection
63 Don't start any new collections
64 Learn Standard Rose origami
65 Learn Ink painting
66 Clean and declutter closet
67
68
69
70 Declutter desk
71
72
73
74 Declutter books
75 Set up a defined classroom area
76 Make wooden Yard holiday decorations
77 Take down Christmas lights when appropriate 1 2 3
78 Polish brass vases
79 Fix porch swing
80 graduate from Ole Miss
81 PEAK field trip to Memphis Zoo
82
83
84 Visit large aquarium
85 Visit University Museum whenever there is a new display
86 Research Keenum heritage
87 Visit Mammaw once a month, at least
88 Visit friends once a week
89 read Bible all the way through
90 read New Testament in Greek
91 read Harry Potter: SS in Latin
92
93 Visit Atlanta Zoo
94 Visit Devery in Kansas
95 Visit Joe and Karla in Houston
96 Visit Pat in Joliet
97
98
99 Buy a house (save for dp)
100 Take out life insurance policy
101 Visit Williamston, SC

I may take this oportunity to be frivolous, though I know some of these already are.

XAIPETE,
Kim

No comments: